What Does Commercial Parking Lot Maintenance Cover?
Parking lot maintenance covers all aspects of a parking lot that a driver or inspector would look at including striping, accessible spaces & signs, stops & bumps, curb and pavement condition.
On a commercial lot, our crews handle each of these, alone or as one job:
- Restriping for stalls, arrows, crosswalks, and fire lanes, using traffic rated paint
- ADA signs on posts, truncated dome mats, and access aisle striping
- Concrete parking bumpers, speed bumps, and speed humps
- Concrete curb repairs
- Crack filling and small asphalt patches
Information about the surface care of your lot, including sealcoating and crack filling, is on our pavement maintenance page. Since each lot is unique and will require a unique combination of services to maintain, you can view our asphalt and sealcoating services for more information on the services we provide. We have provided these services for bank branches (First Horizon and Trustco included), dental offices (Aspen Dental), a retirement center and other lots including the Daytona Beach Racing Club.
How Often Should Your Parking Lot Be Restriped?
Restripe after every sealcoat application and restripe between sealcoat applications if necessary for drivers to be able to determine where the parking stalls are.
Lines between sealcoat applications don't wear evenly. As with most surfaces, entrances, drive aisles and the stalls nearest to the entrance wear the fastest as this is where cars constantly turn and brake. Our striping paint is traffic rated and is intended for use on surfaces that are subject to constant use by cars.
Restriping is the cheapest time to reconfigure your parking lot to better suit your business needs. We have restriped one customer's lot three times since 2003 and actually reconfigured the layout to be totally different from the original in one of those instances.
We like to know if you want to add stalls, change traffic flow or need to meet a local fire code requirement before we paint. It is easy to move a line on the layout on paint day but a real pain to move after we have painted.
What Makes a Parking Lot Fall Out of ADA Compliance?
Typically, the original accessible design has simply worn out over time: paint has faded, trucks have driven into sign posts, etc. and the various components of an accessible path of travel have ceased to function as intended.
The access aisle beside an accessible parking stall is marked by stripes along the stall. When these stripes wear, people park in the access aisle and people using wheelchairs are left without the space they need to get out of their vehicles. Sign posts are often similarly affected, with signs that have been knocked askew or hidden behind shrubs not being of any use.
Truncated dome mats, used at curb ramps to inform people with vision impairments that a sidewalk is ending, must be replaced if they become cracked or start to lift.
We maintain, repair and replace all accessibility elements including repainting the blue, straightening or replacing signs on their posts, replacing worn out mats and resetting the concrete bumpers. Keeping accessibility elements current helps protect people who use parking at your premises and reduces your liability as the premises owner. We have included before and after photos of the lots we have restriped in our gallery.
Can Parking Lot Work Be Done Without Shutting Down Your Business?
Yes. We can perform the work and do some planning around your parking needs.
We work with you to plan around your busy hours and days when spaces cannot be lost. Typically a fresh sealcoat takes about 24 hours to cure before it can be driven on. However, striping moves faster since traffic paint dries much sooner than sealer, and we have a customer that blocks off their entire lot for a day so we can complete the work that day.
Also keep in mind that we need dry pavement for the sealer and traffic paint, and a typical Central Florida afternoon storm can push the start time back if needed. We will keep you updated as to the status of your parking lot work.
On a parking lot, showing up on time is more important than on almost any other job site. An empty lot, coned off for a late arrival, can cost you customers. This is reflected in two of the Google reviews on our homepage.
Why Hire One Crew for Your Whole Parking Lot?
All work can be done by one crew in the correct order so that you are not coordinating a sealer, a striper and a sign company.
For optimal performance, repairs are completed prior to sealcoat, sealcoat is completed prior to striping, and all ADA signs and bumpers are completed after all striping has been painted. When each aspect of a parking lot restoration is completed by separate companies, there is often time wasted while each company waits on the other to complete their aspect of the work. Also, often a newly painted line is covered up by the sealer and has to be repainted.
Property managers use us across many different locations, and one uses us for all of the parking lot restorations they complete. This can include office complexes and mall locations. Some of our customers include Publix, Goodwill, Walmart, Mission Inn Resort & Club and the City of Lakeland.
Reliable Pavement Maintenance is a company based in Tavares that has served customers well for over 40 years. Contact us at (407) 924-8228 Monday through Friday 9 am to 5 pm. An online estimate request is also available. We will send someone to review your lot.
Request an Estimate